Summit (OLCF-4) is a 200-petaFLOP supercomputer operating by the DoE Oak Ridge National Laboratory. Summit was officially unveiled on June 8, 2018 as the fastest supercomputer in the world, overtaking Sunway TaihuLight.
History
Summit is one of three systems as part of the Collaboration of Oak Ridge, Argonne, and Lawrence Livermore Labs (CORAL) procurement program. Research and planning started in 2012 with initial system delivery arriving in late 2017. The full system arrived in early 2018 and the system was officially unveiled on June 8, 2018. Summit is estimated to have cost around $200 million as part of the CORAL procurement program.
Overview
Summit was designed to deliver 5-10x improvement in performance for real big science workload performance over Titan. Compared to Titan which had 18,688 nodes (AMD Opteron + Nvidia Kepler) with a 9 MW power consumption, Summit slightly increased the power consumption to 13 MW, reduced the number of nodes to only 4,608, but tenfold the peak theoretical performance from 27 petaFLOPS to around 225 PF.
Summit has over 200 petaFLOPS of theoretical compute power and over 3 AI exaFLOPS for AI workloads.
Components | System | ||||||
---|---|---|---|---|---|---|---|
Processor | CPU | GPU | Rack | Compute Racks | Storage Racks | Switch Racks | |
Type | POWER9 | V100 | Type | AC922 | SSC (4 ESS GL4) | Mellanox IB EDR | |
Count | 9,216 2 × 18 x 256 | 27,648 6 × 18 x 256 | Count | 256 Racks × 18 Nodes | 40 Racks × 8 Servers | 18 Racks | |
Peak FLOPS | 9.96 PF | 215.7 PF | Power | 59 kW | 38 kW | ||
Peak AI FLOPS | 3.456 EF | 13 MW (Total System) |
Summit has over 10 petabytes of memory.
Summit Total Memory | |||
---|---|---|---|
Type | DDR4 | HBM2 | NVMe |
Node | 512 GiB | 96 GiB | 1.6 GB |
Summit | 2.53 PiB | 475 TiB | 7.37 PB |
Architecture
System
Weighing over 340 tons, Summit takes up 5,600 sq. ft. of floor space at Oak Ridge National Laboratory. Summit consists of 256 compute racks, 40 storage racks, 18 switching director racks, and 4 infrastructure racks. Servers are linked via Mellanox IB EDR interconnect in a three-level non-blocking fat-tree topology.
Compute Rack
Each of Summit's 256 Compute Racks consists of 18 Compute Nodes along with a Mellanox IB EDR for a non-blocking fat-tree interconnect topology (actually appears to be pruned 3-level fat-trees). With 18 nodes, each rack has 9 TiB of DDR4 memory and another 1.7 TiB of HBM2 memory for a total of 10.7 TiB of memory. A rack has a 59 kW max power and a total of 864 TF/s of peak compute power (ORNL reports 775 TF/s).
Compute Node
This section is empty; you can help add the missing info by editing this page. |