From WikiChip
Difference between revisions of "supercomputers/frontier"
< supercomputers

Line 9: Line 9:
 
|introduction=2021
 
|introduction=2021
 
|peak dpflops=1.5 exaFLOPS
 
|peak dpflops=1.5 exaFLOPS
|price=$500,000,000
+
|price=$600,000,000
 
|predecessor=Titan
 
|predecessor=Titan
 
|predecessor link=supercomputers/olcf-4
 
|predecessor link=supercomputers/olcf-4

Revision as of 12:21, 7 May 2019

Edit Values
Frontier
frontier logo.png
frontier-system.png
General Info
SponsorsU.S. Department of Energy
DesignersAMD,
Cray
Introduction2021
Peak FLOPS1.5 exaFLOPS
Price$600,000,000
Succession

Frontier (OLCF-5) is Summit's successor, a planned exascale supercomputer that will be operated by the DoE Oak Ridge National Laboratory. Frontier is expected to go into operation in the 2021-2022 timeframe.

History

Frontier is a planned exascale supercomputer with a theoretical peak performance of over 1,500 petaFLOPS (1.5 EF). The design goal of Frontier is to achieve around 50-100x performance improvement in real science applications or alternatively around 5-10x application performance improvement over Summit.

ornl-exascape-frontier-roadmap.png

Overview

Frontier is expected to be one of the fastest - if not the fastest - supercomputer when delivered in 2021. Comprising over 100 Shasta cabinets, each node will feature a custom AMD EPYC (likely a Milan derivative) along with four custom Radeon GPUs. Interconnects will be comprised of AMD infinity fabric for the node and Slingshot for the system. All in all, Frontier is targeting 2-4x the performance and capacity of Summit's I/O subsystem and 5-10x the real-application performance of Summit with an expected peak performance of over 1.5 exaFLOPS.

See also

designerAMD + and Cray +
introductory date2021 +
logoFile:frontier logo.png +
main imageFile:frontier-system.png +
nameFrontier +
peak flops (double-precision)1.5e+18 FLOPS (1.5e+15 KFLOPS, 1,500,000,000,000 MFLOPS, 1,500,000,000 GFLOPS, 1,500,000 TFLOPS, 1,500 PFLOPS, 1.5 EFLOPS, 0.0015 ZFLOPS) +
release price$ 600,000,000.00 (€ 540,000,000.00, £ 486,000,000.00, ¥ 61,998,000,000.00) +
sponsorUnited States Department of Energy (DOE) +