Line 9: | Line 9: | ||
|introduction=2021 | |introduction=2021 | ||
|peak dpflops=1.5 exaFLOPS | |peak dpflops=1.5 exaFLOPS | ||
− | |price=$ | + | |price=$600,000,000 |
|predecessor=Titan | |predecessor=Titan | ||
|predecessor link=supercomputers/olcf-4 | |predecessor link=supercomputers/olcf-4 |
Revision as of 12:21, 7 May 2019
Edit Values | |
Frontier | |
General Info | |
Sponsors | U.S. Department of Energy |
Designers | AMD, Cray |
Introduction | 2021 |
Peak FLOPS | 1.5 exaFLOPS |
Price | $600,000,000 |
Succession | |
Frontier (OLCF-5) is Summit's successor, a planned exascale supercomputer that will be operated by the DoE Oak Ridge National Laboratory. Frontier is expected to go into operation in the 2021-2022 timeframe.
History
Frontier is a planned exascale supercomputer with a theoretical peak performance of over 1,500 petaFLOPS (1.5 EF). The design goal of Frontier is to achieve around 50-100x performance improvement in real science applications or alternatively around 5-10x application performance improvement over Summit.
Overview
Frontier is expected to be one of the fastest - if not the fastest - supercomputer when delivered in 2021. Comprising over 100 Shasta cabinets, each node will feature a custom AMD EPYC (likely a Milan derivative) along with four custom Radeon GPUs. Interconnects will be comprised of AMD infinity fabric for the node and Slingshot for the system. All in all, Frontier is targeting 2-4x the performance and capacity of Summit's I/O subsystem and 5-10x the real-application performance of Summit with an expected peak performance of over 1.5 exaFLOPS.
See also
designer | AMD + and Cray + |
introductory date | 2021 + |
logo | + |
main image | + |
name | Frontier + |
peak flops (double-precision) | 1.5e+18 FLOPS (1.5e+15 KFLOPS, 1,500,000,000,000 MFLOPS, 1,500,000,000 GFLOPS, 1,500,000 TFLOPS, 1,500 PFLOPS, 1.5 EFLOPS, 0.0015 ZFLOPS) + |
release price | $ 600,000,000.00 (€ 540,000,000.00, £ 486,000,000.00, ¥ 61,998,000,000.00) + |
sponsor | United States Department of Energy (DOE) + |