From WikiChip
Difference between revisions of "intel/microarchitectures/meteor lake"
< intel‎ | microarchitectures

 
(17 intermediate revisions by 12 users not shown)
Line 5: Line 5:
 
|designer=Intel
 
|designer=Intel
 
|manufacturer=Intel
 
|manufacturer=Intel
|introduction=2022
+
|introduction=2023
|process=7 nm
+
|process=Intel 4
|predecessor=Alder Lake
+
|isa=x86-64
|predecessor link=intel/microarchitectures/alder lake
+
|core name=Redwood Cove
 +
|core name 2=Crestmont
 +
|predecessor=Raptor Lake
 +
|predecessor link=intel/microarchitectures/raptor lake
 +
|successor=Arrow Lake
 +
|successor link=intel/microarchitectures/arrow lake
 
}}
 
}}
'''Meteor Lake''' ('''MTL?''') is [[Intel]]'s successor to {{\\|Alder Lake}}, a [[7 nm]] [[microarchitecture]] for mainstream workstations, desktops, and mobile devices.
+
'''Meteor Lake''' ('''MTL''') is [[Intel]]'s successor to {{\\|Raptor Lake}}, a [[Intel 4]] [[microarchitecture]] for mainstream workstations, desktops, and mobile devices. Intel CEO Pat Gelsinger officially announced Meteor Lake and {{\\|Granite Rapids}} at Intel Unleashed: Engineering the Future webcast on March 23, 2021.<ref>https://newsroom.intel.com/news-releases/idm-manufacturing-innovation-product-leadership/</ref><ref>https://newsroom.intel.com/news/intel-unleashed-engineering-future-video/</ref> Intel announced Meteor Lake compute tile tape in on May 24, 2021.<ref>https://twitter.com/gregorymbryant/status/1396860052145770497</ref>
  
 +
{{future information}}
  
{{future information}}
+
== References ==
 +
{{reflist}}

Latest revision as of 15:58, 4 March 2022

Edit Values
Meteor Lake µarch
General Info
Arch TypeCPU
DesignerIntel
ManufacturerIntel
Introduction2023
ProcessIntel 4
Instructions
ISAx86-64
Cores
Core NamesRedwood Cove,
Crestmont
Succession

Meteor Lake (MTL) is Intel's successor to Raptor Lake, a Intel 4 microarchitecture for mainstream workstations, desktops, and mobile devices. Intel CEO Pat Gelsinger officially announced Meteor Lake and Granite Rapids at Intel Unleashed: Engineering the Future webcast on March 23, 2021.[1][2] Intel announced Meteor Lake compute tile tape in on May 24, 2021.[3]

Symbol version future.svg Preliminary Data! Information presented in this article deal with future products, data, features, and specifications that have yet to be finalized, announced, or released. Information may be incomplete and can change by final release.

References[edit]